|
Construction Begins / Trenching & Subroadbed / TRESTLE construction / Trestle Crossbracing & Cheap Bridges / Wiring and Test Run / Scenery & Buildings / Scenery & Buildings Page 2 The wife and I moved into our new home, in Fort Smith Arkansas about 2 months ago and as a die hard garden railway scratchbuilder, it only took about one day after the last box was in the house for me to turn my attention to our back yard and the garden railroad in my head dying to get out. What follows in the coming pages is a sort of construction diary of how it went together and continues to, as I suspect it will never be totally "completed". |
||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||
|
Second, as you can see the backyard is far... FAR from level. So, I laid out a couple of garden hoses to visualize where I would lay the track and then took all of my track and loose fitted it and adjusted my plan to meet the track I had on hand... My son Jeremy and I then took stakes and string and staked both sides of the track, going about 1 1/2 inches on both sides of the track. This made it MUCH easier to dig out once the track was up. |
||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||
|
The entire back side of the line will have a 35 foot run of trestles. Note the PVC pipe for wiring at the bottom. |
||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
Construction Begins / Trenching & Subroadbed / TRESTLE construction / Trestle Crossbracing & Cheap Bridges / Wiring and Test Run / Scenery & Buildings / Scenery & Buildings Page 2 |
||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||
 
| page created with Easy Designer |