24' Diameter Dome Assemblage
Assemble 24' Diameter Dome
 | Pier hole layout |
Using the cedar concrete pad form boards and a center stake, layout the pier holes using rebars as markers.
 | Setting double post in pier holes |
Dig pier holes and set double corner post.
 | First level panels braced at 10 degree slant |
The 1st level base panels are temporarily tacked into place and braced at an approximately 10 degree inward tilt. After all the panels have been bolted together, the base panel is then bolted to base support beam.
 | Temporary scaffold used for 2nd level panels |
A temporary scaffold is used to stage the upperlevel panels into place.
 | Exterior view of partial 24' dome |
This is an exterior view of a the partial complete 24' dome.
 | The awning support structure |
The awning support structure is supported by an auxiliary base beam which is bolted to the main support beam.