3. Step / period : November, 22. 1999 thru February, 7. 2000

Main

 
Strumi's Project : Mustang II N312WS 3

Strumi's Project : Mustang II N312WS
3. Periode


Click on small image or underlined text for full size image.
After viewing full size image selekt "Back" or the equivalent on your browser.

 


Engine mount
Engine mount

Forward Fuselage interior
Forward Fuselage interior

Elevator Bellcrank
Elevator Bellcrank

Battery; Solenoid; Strobe power supplied
Battery; Solenoid; Strobe power supplied

Baggage floor; door  to Battery
Baggage floor; door to Battery

Ampermeter shont
Ampermeter shont

start electric inst.; Firewall
start electric inst.; Firewall

electric installation; Fuel tank 11gal
electric installation; Fuel tank 11gal

panel; Flaps-Stick
panel; Flaps-Stick

Instrument panel; Console; control assembly
Instrument panel; Console; control assembly

Fuel Valve; Flap-Stick
Fuel Valve; Flap-Stick

Landing /Taxi light in Center section
Landing /Taxi light in Center section

2 Com Antenna
2 Com Antenna

parts interior baggage & bottom
parts interior baggage & bottom



======> 4. Step / period : March, 16. 2001 thru May, 11. 2001


======> Back to the first (initial) page



 
This page is maintained by Christel and Walter Strumienski (strumi@aol.com).
Fort Myers, Florida
Internet-adresse: http://members.aol.com/strumi/mustang.html
Last modified on March 2008